About Hex Energy
Our team’s focus on attention to detail makes us the heat pump contractor of choice for commercial and large-scale domestic installations. We are the most reliable resource for businesses, homeowners, self builders and local developers for:
- Ground Source Heat Pumps (GSHP)
- Air Source Heat Pumps (ASHP)
- Water Source Heat Pumps (WSHP)
- Photovoltaic (PV) systems
- Under Floor Heating (UFH)
- Mechanical Ventilation and Heat Recovery Systems (MVHR)
There are very few companies in the UK qualified to install ground source heat pumps. Hex Energy is the leading installer of ground source heat pumps in central UK and are the only company in the UK to have our own Certified Geoexchange Designer to inspect, design and install a system suited to your needs.
Most companies do not include all elements necessary for a turnkey and bespoke installation and will exclude vital elements, leaving the client to source drilling and gig trenches for example. This is not an extra, it is essential works for professional installation work that encompasses the entire system.
Contact Hex Energy to find out how we can save you money on your energy bills and reduce your carbon footprint.
Hex Energy is led by Andy Howley who is a third generation well driller and has been heavily involved in developing the ground source energy industry in the UK and beyond. He has an understanding of ground conditions and drilling techniques that is second to none and has installed both open and closed loop systems on a whole range of celebrated buildings. With Hex Energy he works alongside many of the major developers and building contractors in the UK.
Whilst the technology is not complex, the planning, design and subsequent build of a ground source system is not a straightforward exercise. Andy Howley is one of the most highly qualified commercial ground source energy designers in the UK with Certified Geoexchange Designer (CGD) status. As far as he is concerned, getting it wrong is not an option; the properties on which the team work will need to deliver target energy efficiencies many years into the future.
)

)

)
)
)